The Watermark Tempe
Market Sector
Mixed-Use
Office
Parking
Location
Tempe, AZ
Owner
Fenix Development
Architect
Nelsen Partners
Contractor
Okland Construction
Suntec Concrete
Tpac
Construction Type
C.I.P. Concrete
Pre-Cast Concrete
Located on the north bank of Tempe Town Lake, The Watermark Phase I development includes 265,000 SF of Class A office space, and 44,000 SF of separate restaurant and retail space. The 16-story office building consists of 8 stories of office space above 9 levels of parking (7 above grade and 2 below) with a public area on level 1. Additional parking is provided in an 8-level free-standing precast concrete parking garage; retail space is located on the ground level. A pedestrian bridge connects the office building to the parking garage at the 8th level.
Learn more about how PK Associates solves project challenges in this case study.
The Structural Engineers Association of Arizona recognizes ingenuity, creative achievement and innovation in structural engineering.