Project Search

Please search with the criteria below.


N/A
0-49,999
50,000-99,999
100,000-199,999
200,000-349,000
350,000-499,999
500,000-749,999
750,000-999,999
1,000,000-1,499,999
1,500,000+

Aviation/Transportation
Bridges
Commercial Office
Educational (Higher Ed)
Educational (K-12)
Financial Institutions
Healthcare
Hospitality
Industrial & Manufacturing
Mixed Use
Native American
Performing Arts & Entertainment
Public & Institutional
Parking Structures
Recreational Facilities
Religious
Residential
Retail
Technology
Specialty Projects

Construction Manager at Risk
Design-Build
Design-Bid-Build
Fast Track
Integrated Project Delivery

Bridges
Concrete
Pre-Cast Concrete
High Rise
Long Span
Masonry
Post-Tension Structures
Structural Steel
Wood Frame Structures

Building Information Modeling
Building Review/Due Diligence
Construction Administration
Forensics
Inspections
Plan Check/Peer Review
Renovation
Seismic/OSHPD
Structural Engineering
Sustainability
Value Engineering


CITYSCAPE

Palomar Hotel at CityScape

Owner: Red Development LLC
Architect: Callison - Phase I/Smith Group - Phase II
Contractor: Hunt Construction
Square Footage Range: 1,500,000+
Location: Phoenix, Arizona
PDF Download

Project Information

CityScape is a 1.8 million SF mixed use urban project located at the very center of Downtown Phoenix.  The combination of commercial, retail, and hotel development is the focal point for urban living and community activity in a revitalized downtown Phoenix, nestled between the city's entertainment, education, business and government institutions.  Bordered on three sides by the city's new light rail transit system, the project's neighbors include the US Airways Center, Chase Field, the Phoenix Convention Center, Arizona State University's 15,000-student downtown Phoenix campus, the Phoenix Biomedical Campus, City Hall and the Maricopa County administrative and court complex.

Design-build mixed use development.
Parking structure, 2000 parking spaces, 4 levels below grade.
Phase I: Tower one, 30 stories 700,000 SF, construction complete 2010
Phase II: Tower two, 21 Stories, 500,000 SF, construction complete 2012
Project Cost: $900,000,000

Structural Integrity • Collaborative Solutions