Return to Portfolio

Northrop Grumman Satellite Division Production Facility

Market Sector

Industrial

Location

Gilbert, AZ

Owner

Northrop Grumman

Architect

Gensler

Contractor

Willmeng Construction, Inc.

Construction Type

Tilt-Up Concrete

This manufacturing facility is part of the largest and most advanced satellite assembly and test facilities in the nation and is designed to provide multiple clean rooms and production spaces.

100,000 SF ground up industrial building and tenant improvements for an office/light assembly facility with secure space requirements (8,000 SF) in a developer-built shell building. This building features large bays to house overhead cranes with a clear height of 55 feet and transition bays as tall as 65 feet, plus a 10,000 SF mezzanine level to be used as office space.

In November 2020, the AEC team celebrated the successful tilt of the heaviest concrete tilt panel in the nation! The first panel erected on Monday, Nov. 2, weighed a total of 504,000 lbs. and was 87 feet, 7 inches (eighth tallest tilt panel in North and South America).

2023 RED Award

Industrial project of the year (Less than 200,000 SF)

Want to find out more about this project?

Don’t hesitate to ask.

Contact Us