The upgrade to the existing 12.5 MGD Water Quality and Resource Recovery Plant (WQRRP) includes modifications to existing concrete and masonry structures; a new two-story structural steel industrial building housing sludge dewatering and thermal drying equipment; a 20’ x 30’ x 10’-tall steel-framed mezzanine within the existing sludge thickening building to support two new rotary drum thickeners above the existing floor; modifications to the headworks channel to accommodate a new grit “teacup” system; a new concrete slab foundation for a 2 MW digester gas engine cogeneration package unit; and foundations for additional mechanical equipment.

The upgrades improved the energy efficiency of the plant through the design and installation of new process equipment.